53 lines
3.3 KiB
HTML
53 lines
3.3 KiB
HTML
<?xml version="1.0" encoding="utf-8"?>
|
|
<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN"
|
|
"http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
|
|
<html xmlns="http://www.w3.org/1999/xhtml" lang="en-US" xml:lang="en-us">
|
|
<head>
|
|
<meta http-equiv="Content-Type" content="text/html; charset=utf-8" />
|
|
<meta name="dc.language" scheme="rfc1766" content="en-us" />
|
|
<!-- All rights reserved. Licensed Materials Property of IBM -->
|
|
<!-- US Government Users Restricted Rights -->
|
|
<!-- Use, duplication or disclosure restricted by -->
|
|
<!-- GSA ADP Schedule Contract with IBM Corp. -->
|
|
<meta name="dc.date" scheme="iso8601" content="2005-10-17" />
|
|
<meta name="copyright" content="(C) Copyright IBM Corporation 2006" />
|
|
<meta name="security" content="public" />
|
|
<meta name="Robots" content="index,follow"/>
|
|
<meta http-equiv="PICS-Label" content='(PICS-1.1 "http://www.icra.org/ratingsv02.html" l gen true r (cz 1 lz 1 nz 1 oz 1 vz 1) "http://www.rsac.org/ratingsv01.html" l gen true r (n 0 s 0 v 0 l 0) "http://www.classify.org/safesurf/" l gen true r (SS~~000 1))' />
|
|
<title>Tips: How to start and stop your system with OptiConnect</title>
|
|
<link rel="stylesheet" type="text/css" href="ibmidwb.css" />
|
|
<link rel="stylesheet" type="text/css" href="ic.css" />
|
|
</head>
|
|
<body>
|
|
<a id="Top_Of_Page" name="Top_Of_Page"></a><!-- Java sync-link -->
|
|
<script language = "Javascript" src = "../rzahg/synch.js" type="text/javascript"></script>
|
|
|
|
|
|
<a name="tipss"></a>
|
|
<h2 id="tipss">Tips: How to start and stop your system with OptiConnect</h2>
|
|
<p>When you stop OptiConnect, you are also stopping any prestarted agent jobs.
|
|
The more agent jobs, the longer it takes to end QSOC subsystem. Similarly,
|
|
when starting OptiConnect, the larger the initial number of agent jobs you
|
|
specified, the longer the subsystem takes to start.</p>
|
|
<p>Balancing the number of prestarted agent jobs, and the time the subsystem
|
|
takes to start or stop, is important. Prestarted agent jobs use resources
|
|
as the jobs start or end. You must consider how many prestarted agent jobs
|
|
you may need.</p>
|
|
<p>For example, if there are many short transactions, as when retail stores
|
|
process credit card authorizations, increasing the number of prestarted jobs
|
|
may be beneficial. Increasing the number of prestarted jobs also increases
|
|
the time the subsystem QSOC takes to start. However, prestarted jobs allow
|
|
you to quickly process the credit card authorizations.</p>
|
|
<p>On the other hand, you may have longer or less numerous transactions. For
|
|
example, when a teller at a bank signs on for the day. In this type of environment,
|
|
you may decide that less prestarted jobs and a shorter system startup is beneficial.</p>
|
|
<p>For more information on how to alter the number of prestarted jobs, see <a href="rzau3xtune.htm#xtune">OptiConnect performance factors</a>.</p>
|
|
<p>Prior to ending the QSOC subsystems, you should vary off the *OPC controllers
|
|
and the corresponding controllers on the other system. The ENDSBS QSOC command
|
|
leaves the controllers in an unusable state that requires the user to vary
|
|
them off, then on, to activate. If the user varies the controllers off manually,
|
|
then less processing takes place while ending the subsystem.</p>
|
|
<a id="Bot_Of_Page" name="Bot_Of_Page"></a>
|
|
</body>
|
|
</html>
|