92 lines
6.4 KiB
HTML
92 lines
6.4 KiB
HTML
<?xml version="1.0" encoding="UTF-8"?>
|
|
<!DOCTYPE html
|
|
PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
|
|
<html lang="en-us" xml:lang="en-us">
|
|
<head>
|
|
<meta http-equiv="Content-Type" content="text/html; charset=utf-8" />
|
|
<meta name="security" content="public" />
|
|
<meta name="Robots" content="index,follow" />
|
|
<meta http-equiv="PICS-Label" content='(PICS-1.1 "http://www.icra.org/ratingsv02.html" l gen true r (cz 1 lz 1 nz 1 oz 1 vz 1) "http://www.rsac.org/ratingsv01.html" l gen true r (n 0 s 0 v 0 l 0) "http://www.classify.org/safesurf/" l gen true r (SS~~000 1))' />
|
|
<meta name="DC.Type" content="concept" />
|
|
<meta name="DC.Title" content="Perform resource management for a partitioned server" />
|
|
<meta name="abstract" content="After you change a hardware feature, you may need to perform the following tasks:" />
|
|
<meta name="description" content="After you change a hardware feature, you may need to perform the following tasks:" />
|
|
<meta name="DC.Relation" scheme="URI" content="rzamdfeatureupgrade.htm" />
|
|
<meta name="DC.Relation" scheme="URI" content="rzamdfeatureupgrade.htm" />
|
|
<meta name="DC.Relation" scheme="URI" content="rzamdfeatureupgradedone.htm" />
|
|
<meta name="DC.Relation" scheme="URI" content="../rzait/rzaitmoveresources.htm" />
|
|
<meta name="DC.Relation" scheme="URI" content="../books/sc415304.pdf" />
|
|
<meta name="DC.Relation" scheme="URI" content="rzamdwrkhdwprd.htm" />
|
|
<meta name="DC.Relation" scheme="URI" content="rzamdproductionlpar.htm" />
|
|
<meta name="DC.Relation" scheme="URI" content="../rzaig/rzaigconfigcreatecluster.htm" />
|
|
<meta name="DC.Relation" scheme="URI" content="../rzaly/rzalyconfigure.htm" />
|
|
<meta name="DC.Relation" scheme="URI" content="rzamdcompleteupgrade.htm" />
|
|
<meta name="copyright" content="(C) Copyright IBM Corporation 1998, 2006" />
|
|
<meta name="DC.Rights.Owner" content="(C) Copyright IBM Corporation 1998, 2006" />
|
|
<meta name="DC.Format" content="XHTML" />
|
|
<meta name="DC.Identifier" content="rzamdresourcemgmtlpar" />
|
|
<meta name="DC.Language" content="en-us" />
|
|
<!-- All rights reserved. Licensed Materials Property of IBM -->
|
|
<!-- US Government Users Restricted Rights -->
|
|
<!-- Use, duplication or disclosure restricted by -->
|
|
<!-- GSA ADP Schedule Contract with IBM Corp. -->
|
|
<link rel="stylesheet" type="text/css" href="./ibmdita.css" />
|
|
<link rel="stylesheet" type="text/css" href="./ic.css" />
|
|
<title>Perform resource management for a partitioned server</title>
|
|
</head>
|
|
<body id="rzamdresourcemgmtlpar"><a name="rzamdresourcemgmtlpar"><!-- --></a>
|
|
<!-- Java sync-link --><script language="Javascript" src="../rzahg/synch.js" type="text/javascript"></script>
|
|
<h1 class="topictitle1">Perform resource management for a partitioned server</h1>
|
|
<div><p>After you change a hardware feature, you may need to perform the
|
|
following tasks:</p>
|
|
<ul><li>Assign resources to partitions as necessary. <p>For information about
|
|
assigning resources to a partition, see Perform dynamic movement of resources.</p>
|
|
</li>
|
|
<li>If you have changed the disk configuration, perform disk unit management
|
|
to first protect and then configure the disks on your server. <p>To do this,
|
|
you can use the Work with Disk Units option from the Dedicated Service Tools
|
|
display. To learn how, see Chapter 18. "Procedures for Configuring Disks and
|
|
Disk Protection" of the Backup and Recovery Guide.</p>
|
|
<div class="note"><span class="notetitle">Note:</span> Once you have
|
|
completed your disk configuration, you can remove any unused disk units from
|
|
the configuration using dedicated service tools (DST). For information, see
|
|
"How to Remove a Disk unit from an Auxiliary Storage Pool" in Chapter 19.
|
|
"Working with Auxiliary Storage Pools" of the Backup and Recovery Guide. <p>Disk
|
|
units that you remove from the configuration should also be physically removed
|
|
to prevent them from being added back into the configuration during an IPL.</p>
|
|
</div>
|
|
</li>
|
|
<li>Update workstations, communications, removable media, LAN, WAN, or Integrated xSeries<sup>®</sup> Server
|
|
(IXS) hardware resource names as necessary. <p>For information about changing
|
|
hardware resource names, see the Fix hardware resource names after an upgrade
|
|
topic.</p>
|
|
</li>
|
|
<li>If you have changed your console type, perform the IPL and resource management
|
|
tasks in Prepare the partitioned server for production.</li>
|
|
<li>If you have made changes to enable clusters or independent disk pools,
|
|
use the information in Configure a cluster and Configure independent disk
|
|
pools.</li>
|
|
</ul>
|
|
</div>
|
|
<div>
|
|
<div class="familylinks">
|
|
<div class="parentlink"><strong>Parent topic:</strong> <a href="rzamdfeatureupgrade.htm" title="Changing one or more hardware features to satisfy capacity and compatibility requirements may be needed before upgrading to V5R4 and to the new server.">Add or replace a hardware feature</a></div>
|
|
</div>
|
|
<div class="relconcepts"><strong>Related concepts</strong><br />
|
|
<div><a href="rzamdfeatureupgradedone.htm" title="Completing the hardware feature change is described in this topic.">Perform the hardware feature change</a></div>
|
|
</div>
|
|
<div class="reltasks"><strong>Related tasks</strong><br />
|
|
<div><a href="rzamdfeatureupgrade.htm" title="Changing one or more hardware features to satisfy capacity and compatibility requirements may be needed before upgrading to V5R4 and to the new server.">Add or replace a hardware feature</a></div>
|
|
<div><a href="../rzait/rzaitmoveresources.htm">Perform dynamic movement of resources</a></div>
|
|
<div><a href="rzamdwrkhdwprd.htm" title="Following an upgrade or migration, you may have hardware resources that are in different locations than they were on your source server.">Fix hardware resource names after an upgrade</a></div>
|
|
<div><a href="rzamdproductionlpar.htm" title="To finish the resource management and prepare your new server for production, perform the following steps.">Prepare the partitioned server for production</a></div>
|
|
<div><a href="../rzaig/rzaigconfigcreatecluster.htm">Configure a cluster</a></div>
|
|
<div><a href="../rzaly/rzalyconfigure.htm">Configure independent disk pools</a></div>
|
|
<div><a href="rzamdcompleteupgrade.htm" title="This is the complete list of all the possible upgrade tasks. It is not customized for your upgrade. Use this topic if you are using a CD-ROM or PDF version of the information.">Perform all upgrade tasks</a></div>
|
|
</div>
|
|
<div class="relinfo"><strong>Related information</strong><br />
|
|
<div><a href="../books/sc415304.pdf" target="_blank">Backup and Recovery Guide</a></div>
|
|
</div>
|
|
</div>
|
|
</body>
|
|
</html> |