ibm-information-center/dist/eclipse/plugins/i5OS.ic.rzaks_5.4.0.1/rzaksajs6calendar.htm

77 lines
5.4 KiB
HTML

<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE html
PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
<html lang="en-us" xml:lang="en-us">
<head>
<meta http-equiv="Content-Type" content="text/html; charset=utf-8" />
<meta name="security" content="public" />
<meta name="Robots" content="index,follow" />
<meta http-equiv="PICS-Label" content='(PICS-1.1 "http://www.icra.org/ratingsv02.html" l gen true r (cz 1 lz 1 nz 1 oz 1 vz 1) "http://www.rsac.org/ratingsv01.html" l gen true r (n 0 s 0 v 0 l 0) "http://www.classify.org/safesurf/" l gen true r (SS~~000 1))' />
<meta name="DC.Type" content="task" />
<meta name="DC.Title" content="Set up a scheduling calendar" />
<meta name="abstract" content="Set up a calendar of selected days for scheduling a job or job group. This calendar can specify the dates to be used for scheduling a job, or it can be used in conjunction with other schedules." />
<meta name="description" content="Set up a calendar of selected days for scheduling a job or job group. This calendar can specify the dates to be used for scheduling a job, or it can be used in conjunction with other schedules." />
<meta name="DC.Relation" scheme="URI" content="rzaksajs3custom.htm" />
<meta name="DC.Relation" scheme="URI" content="rzaksajspermissions.htm" />
<meta name="DC.Relation" scheme="URI" content="rzaksajs7holiday.htm" />
<meta name="copyright" content="(C) Copyright IBM Corporation 2004-2006" />
<meta name="DC.Rights.Owner" content="(C) Copyright IBM Corporation 2004-2006" />
<meta name="DC.Format" content="XHTML" />
<meta name="DC.Identifier" content="rzaksajs6calendar" />
<meta name="DC.Language" content="en-us" />
<!-- All rights reserved. Licensed Materials Property of IBM -->
<!-- US Government Users Restricted Rights -->
<!-- Use, duplication or disclosure restricted by -->
<!-- GSA ADP Schedule Contract with IBM Corp. -->
<link rel="stylesheet" type="text/css" href="./ibmdita.css" />
<link rel="stylesheet" type="text/css" href="./ic.css" />
<title>Set up a scheduling calendar</title>
</head>
<body id="rzaksajs6calendar"><a name="rzaksajs6calendar"><!-- --></a>
<!-- Java sync-link --><script language="Javascript" src="../rzahg/synch.js" type="text/javascript"></script>
<h1 class="topictitle1">Set up a scheduling calendar</h1>
<div><p>Set up a calendar of selected days for scheduling a job or job
group. This calendar can specify the dates to be used for scheduling a job,
or it can be used in conjunction with other schedules.</p>
<div class="section"><p>A <span class="uicontrol">scheduling calendar</span> is a calendar of
selected days that you can use for scheduling a job or job group. You can
display scheduling calendars, add a new scheduling calendar, add a new scheduling
calendar based on an existing one, or remove an existing calendar, provided
it is not in use by a currently scheduled job.</p>
<p>You can select a calendar
and display its properties to make changes. When you select a calendar, the
details of the calendar are displayed under Details.</p>
<p>To set up a scheduling
calendar, follow these steps:</p>
</div>
<ol><li><span>Open <span class="uicontrol">Work Management</span> from your iSeries Navigator
window.</span></li>
<li><span>Right-click <span class="uicontrol">Advanced Job Scheduler</span> and click <span class="uicontrol">Properties</span>.</span></li>
<li><span> On the General page, click <span class="uicontrol">Calendars</span>.</span></li>
<li><span>On the Scheduling Calendars page, click <span class="uicontrol">New</span>.</span></li>
<li><span>Specify a <span class="uicontrol">Name</span>.</span></li>
<li><span>In the <span class="uicontrol">Description</span> field, specify text that
describes the calendar.</span></li>
<li><span>Choose a <span class="uicontrol">Reference calendar</span> if applicable.
This is a calendar that was previously set up, and its properties will be
applied to the new calendar as if you merged the two calendars. You will not
have reference calendars if this is your first time using the Advanced Job
Scheduler.</span></li>
<li><span>Select the dates that you want to include on your calendar. You
must specify whether each date you have selected is for the current year or
for every year in the <span class="uicontrol">Selected date</span> field, before you
can add another date to the calendar. Otherwise, any date you select will
be deselected when you click a different date.</span></li>
<li><span>Specify if you want certain days of the week to be included on
the calendar.</span></li>
</ol>
</div>
<div>
<div class="familylinks">
<div class="parentlink"><strong>Parent topic:</strong> <a href="rzaksajs3custom.htm" title="After you have installed the Advanced Job Scheduler, you need to configure it. After you have finished this preliminary work, you are ready to begin scheduling jobs.">Set up the Advanced Job Scheduler</a></div>
<div class="previouslink"><strong>Previous topic:</strong> <a href="rzaksajspermissions.htm" title="Specify permission levels for jobs, functions of the product, and provide new job default permissions.">Specify permission levels</a></div>
<div class="nextlink"><strong>Next topic:</strong> <a href="rzaksajs7holiday.htm" title="Set up a calendar for days that you do not want to allow processing for a scheduled job. Alternate days can be specified for each exception day, or processing can be skipped completely for that day.">Set up a holiday calendar</a></div>
</div>
</div>
</body>
</html>