ibm-information-center/dist/eclipse/plugins/i5OS.ic.rzahr_5.4.0.1/rzahrimpgmpi.htm

91 lines
6.2 KiB
HTML
Raw Normal View History

2024-04-02 14:02:31 +00:00
<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE html
PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
<html lang="en-us" xml:lang="en-us">
<head>
<meta http-equiv="Content-Type" content="text/html; charset=utf-8" />
<meta name="security" content="public" />
<meta name="Robots" content="index,follow" />
<meta http-equiv="PICS-Label" content='(PICS-1.1 "http://www.icra.org/ratingsv02.html" l gen true r (cz 1 lz 1 nz 1 oz 1 vz 1) "http://www.rsac.org/ratingsv01.html" l gen true r (n 0 s 0 v 0 l 0) "http://www.classify.org/safesurf/" l gen true r (SS~~000 1))' />
<meta name="DC.Type" content="task" />
<meta name="DC.Title" content="Implementing a power-handling program" />
<meta name="abstract" content="This topic highlights what you need to do to use a power-handling program for a system when a full uninterruptible power supply is attached." />
<meta name="description" content="This topic highlights what you need to do to use a power-handling program for a system when a full uninterruptible power supply is attached." />
<meta name="DC.Relation" scheme="URI" content="rzahrphpgmco.htm" />
<meta name="DC.Relation" scheme="URI" content="rzahrwrtpgmco.htm" />
<meta name="DC.Relation" scheme="URI" content="rzahrxmppgmrx.htm" />
<meta name="copyright" content="(C) Copyright IBM Corporation 1998, 2006" />
<meta name="DC.Rights.Owner" content="(C) Copyright IBM Corporation 1998, 2006" />
<meta name="DC.Format" content="XHTML" />
<meta name="DC.Identifier" content="rzahrimpgmpi" />
<meta name="DC.Language" content="en-us" />
<!-- All rights reserved. Licensed Materials Property of IBM -->
<!-- US Government Users Restricted Rights -->
<!-- Use, duplication or disclosure restricted by -->
<!-- GSA ADP Schedule Contract with IBM Corp. -->
<link rel="stylesheet" type="text/css" href="./ibmdita.css" />
<link rel="stylesheet" type="text/css" href="./ic.css" />
<title>Implementing a power-handling program</title>
</head>
<body id="rzahrimpgmpi"><a name="rzahrimpgmpi"><!-- --></a>
<!-- Java sync-link --><script language="Javascript" src="../rzahg/synch.js" type="text/javascript"></script>
<h1 class="topictitle1">Implementing a power-handling program</h1>
<div><p><span><img src="./delta.gif" alt="Start of change" />This topic highlights what you need to do to use
a power-handling program for a system when a full uninterruptible power supply
is attached.<img src="./deltaend.gif" alt="End of change" /></span></p>
<div class="section"><div class="note"><span class="notetitle">Note:</span> This example assumes that QCTL is the controlling subsystem. </div>
</div>
<ol><li class="stepexpand"><span>Because of the critical nature of a power-handling program, you
should isolate the objects used by the power-handling program in their own
library and secure them from other users, as follows:</span> <pre>CRTLIB LIB(UPSLIB) AUT(*EXCLUDE) CRTAUT(*EXCLUDE)</pre>
</li>
<li class="stepexpand"><span>A power-handling program requires exclusive use of a message queue.
For this reason, you should create a unique message queue and exclude its
use from all other users and general system use, as follows:</span> <pre>CRTMSGQ MSGQ(UPSLIB/UPSMSGQ) AUT(*EXCLUDE)</pre>
</li>
<li class="stepexpand"><span>Create the CL power-handling program and exclude its use from all
other users, as follows:</span> <pre>CRTCLPGM PGM(UPSLIB/UPSPGM) AUT(*EXCLUDE)</pre>
</li>
<li class="stepexpand"><span>Create the job description for the power-handling program you want
started automatically whenever the controlling subsystem is started.</span> <pre>CRTJOBD JOBD(UPSLIB/UPSJOBD) JOBQ(QSYS/QCTL2)
JOBPTY(1) RQSDTA('CALL UPSLIB/UPSPGM')
AUT(*EXCLUDE) USER(<span class="synph"><span class="var">xxxxx</span></span>)</pre>
<div class="note"><span class="notetitle">Note:</span> You
must provide a user profile to use the job description as an auto-start job.</div>
</li>
<li class="stepexpand"><span>Create an alternative controlling subsystem description by making
a copy of the current controlling subsystem description, as follows:</span> <pre>CRTDUPOBJ OBJ(QCTL) FROMLIB(QSYS)
OBJTYPE(*SBSD) TOLIB(QSYS) NEWOBJ(QCTL2)</pre>
</li>
<li class="stepexpand"><span>Change your startup program to start all subsystems. You will
need to include a check to see if system value QCTLSBSD is equal to QCTL2.
See system value QSTRUPPGM for the name and library. If you do not change
the startup program it will not check for QCTL2 in QSYS or QGPL and the startup
program will end without starting the rest of your subsystems. </span></li>
<li class="stepexpand"><span>Add the autostart job entry to the alternative controlling subsystem
description, as follows:</span> <pre>ADDAJE SBSD(QSYS/QCTL2) JOB(QSYS/QCTL2)
JOBD(UPSLIB/UPSJOBD)</pre>
</li>
<li class="stepexpand"><span>Change the controlling subsystem system value to use the alternative
controlling subsystem description, as follows:</span> <pre>CHGSYSVAL SYSVAL(QCTLSBSD) VALUE('QCTL2')</pre>
</li>
<li class="stepexpand"><span>Change the system values to allow the program to handle a power
outage, as follows:</span> <pre>CHGSYSVAL SYSVAL(QUPSMSGQ) VALUE('UPSMSGQ UPSLIB')
CHGSYSVAL SYSVAL(QUPSDLYTIM) VALUE(*NOMAX)</pre>
</li>
<li class="stepexpand"><span>Perform an IPL of the system to have the new controlling subsystem
description take effect, as follows:</span> <pre>PWRDWNSYS OPTION(*IMMED) RESTART(*YES)</pre>
</li>
</ol>
</div>
<div>
<div class="familylinks">
<div class="parentlink"><strong>Parent topic:</strong> <a href="rzahrphpgmco.htm" title="System software support is essentially the same for both the battery feature and the uninterruptible power supply attachment.">Enabling a power-handling program to control system activity during a power interruption</a></div>
<div class="nextlink"><strong>Next topic:</strong> <a href="rzahrwrtpgmco.htm" title="A power-handling program should be activated at each IPL and remain active at all times. It should be accounted for in the activity level available in work management subsystem specifications.">Writing a power-handling program</a></div>
</div>
<div class="reltasks"><strong>Related tasks</strong><br />
<div><a href="rzahrxmppgmrx.htm" title="You can use the sample program with a full uninterruptible power supply.">Example: Power-handling CL program</a></div>
</div>
</div>
</body>
</html>