ibm-information-center/dist/eclipse/plugins/i5OS.ic.rzamd_5.4.0.1/rzamdexpanupgradelparbus.htm

118 lines
8.4 KiB
HTML
Raw Normal View History

2024-04-02 14:02:31 +00:00
<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE html
PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
<html lang="en-us" xml:lang="en-us">
<head>
<meta http-equiv="Content-Type" content="text/html; charset=utf-8" />
<meta name="security" content="public" />
<meta name="Robots" content="index,follow" />
<meta http-equiv="PICS-Label" content='(PICS-1.1 "http://www.icra.org/ratingsv02.html" l gen true r (cz 1 lz 1 nz 1 oz 1 vz 1) "http://www.rsac.org/ratingsv01.html" l gen true r (n 0 s 0 v 0 l 0) "http://www.classify.org/safesurf/" l gen true r (SS~~000 1))' />
<meta name="DC.Type" content="task" />
<meta name="DC.Title" content="Reassign buses and IOPs" />
<meta name="abstract" content="The following steps reassign the new buses and IOPs to the required partition or partitions, which in turn correct the partition configuration errors." />
<meta name="description" content="The following steps reassign the new buses and IOPs to the required partition or partitions, which in turn correct the partition configuration errors." />
<meta name="DC.Relation" scheme="URI" content="rzamdexpanupgradelparresource.htm" />
<meta name="DC.Relation" scheme="URI" content="rzamdexpanupgradelparresource.htm" />
<meta name="DC.Relation" scheme="URI" content="rzamdexpanupgradelparcfgbus.htm" />
<meta name="DC.Relation" scheme="URI" content="../rzait/rzaitmoveresources.htm" />
<meta name="DC.Relation" scheme="URI" content="../rzamh/rzamhaccess.htm" />
<meta name="copyright" content="(C) Copyright IBM Corporation 1998, 2006" />
<meta name="DC.Rights.Owner" content="(C) Copyright IBM Corporation 1998, 2006" />
<meta name="DC.Format" content="XHTML" />
<meta name="DC.Identifier" content="rzamdexpanupgradelparbus" />
<meta name="DC.Language" content="en-us" />
<!-- All rights reserved. Licensed Materials Property of IBM -->
<!-- US Government Users Restricted Rights -->
<!-- Use, duplication or disclosure restricted by -->
<!-- GSA ADP Schedule Contract with IBM Corp. -->
<link rel="stylesheet" type="text/css" href="./ibmdita.css" />
<link rel="stylesheet" type="text/css" href="./ic.css" />
<title>Reassign buses and IOPs</title>
</head>
<body id="rzamdexpanupgradelparbus"><a name="rzamdexpanupgradelparbus"><!-- --></a>
<!-- Java sync-link --><script language="Javascript" src="../rzahg/synch.js" type="text/javascript"></script>
<h1 class="topictitle1">Reassign buses and IOPs</h1>
<div><p>The following steps reassign the new buses and IOPs to the required
partition or partitions, which in turn correct the partition configuration
errors.</p>
<div class="section"><p></p>
<div class="note"><span class="notetitle">Note:</span> For information about assigning resources to a partition,
see Perform dynamic movement of resources.</div>
</div>
<ol><li class="stepexpand" id="rzamdexpanupgradelparbus__parbus1"><a name="rzamdexpanupgradelparbus__parbus1"><!-- --></a><span>Identify the new bus numbers for the converted or
recabled expansion units. Use dedicated service tools (DST) and the Hardware
Service Manager (HSM) to view the partitions' current resources and determine
the new or reassigned bus numbers.</span><ol type="a"><li><span>Access DST and sign on.</span></li>
<li><span>From the DST main menu, select option 7 (Start a Service Tool),
and press Enter.</span></li>
<li><span>Select option 4 (Hardware Service Manager (HSM)), and press
Enter.</span></li>
<li><span>Select option 1 (Packaging Hardware Resources), and press Enter.</span></li>
<li id="rzamdexpanupgradelparbus__parbusframeid"><a name="rzamdexpanupgradelparbus__parbusframeid"><!-- --></a><span>Find the frame ID (from the front of the
converted or recabled expansion unit) and enter option 8 (Associated logical
resources) beside it and press Enter.</span></li>
<li><span>For converted expansion units, two buses are identified on the
resulting display. For recabled expansion units, there will be one bus identified
on the resulting display. Enter option 5 (Display detail) beside each one
and press Enter to identify and record the bus numbers for these expansion
units.</span></li>
<li><span>Exit the HSM and return to the main DST menu.</span></li>
<li><span>From DST, select option 11 (Work with System Partitions), and
press Enter. The Work with System Partitions display appears.</span></li>
<li><span>Select option 1 (Display Partition Information), and press Enter.
The Display Partition Information display appears.</span></li>
<li><span>Select option 5 (Display System I/O Resources) to view the current
partition resources. This view shows old buses and IOPs as well as the new
and changed buses and IOPs. Compare the IOA serial numbers on the bus identified
in step <a href="#rzamdexpanupgradelparbus__parbusframeid">1.e</a> above
to the original printout to ensure that they match.</span></li>
</ol>
</li>
<li class="stepexpand"><span>Correct the bus ownership for the new buses. The old buses are
still assigned to the same partitions. <span class="uicontrol">Do not take any action
on the old I/O resources at this time.</span> From the Work with Partitions
display, type option 3 (Work with partition configuration), and press Enter.</span> <ul><li>If the new buses are to be owned by a secondary partition, type option
4 (Remove I/O resources) and remove them and all of the I/O on them from the
primary partition.</li>
<li>If the buses are to be owned by the primary partition, type option 5 (Change
bus ownership type) next to the primary partition to correct the bus ownership
of the new buses.</li>
</ul>
</li>
<li class="stepexpand"><span>Assign the new buses and IOPs to the correct partition using the
output from the LPAR Validation Tool (LVT) and the System I/O resources printouts.
Add the bus and I/O resources to the required partition or partitions on the
Work with Partition Configuration display using option 3 (Add I/O resources).</span></li>
<li class="stepexpand"><span>If a partition's load source, console, alternate IPL or Electronic
Customer Support resources are installed in a expansion unit that was converted
or recabled, reselect those resources for each partition affected by the expansion
unit conversion. Use the Work with Partition Configuration display (options
6, 7, 8, and 9) as needed to assign the critical partition resources.</span></li>
<li class="stepexpand" id="rzamdexpanupgradelparbus__parbusstep5"><a name="rzamdexpanupgradelparbus__parbusstep5"><!-- --></a><span>Turn on the secondary partitions in B manual mode.</span></li>
<li class="stepexpand"><span><strong>Stop. Do not proceed until all secondary partitions turn on
successfully.</strong> If a secondary partition does not turn on successfully,
a previous step may not have been performed properly. Verify that all hardware
is assigned to the correct partition or partitions. If hardware has not been
assigned to the correct partition or partitions, repeat steps <a href="#rzamdexpanupgradelparbus__parbus1">1</a> through <a href="#rzamdexpanupgradelparbus__parbusstep5">5</a>. If a secondary partition still does not turn on successfully,
contact IBM<sup>®</sup> software
support for assistance.</span></li>
<li class="stepexpand"><span>At this time all hardware should be operational and assigned to
the required partitions. Verify all system hardware reports in correctly at
this time.</span></li>
</ol>
</div>
<div>
<div class="familylinks">
<div class="parentlink"><strong>Parent topic:</strong> <a href="rzamdexpanupgradelparresource.htm" title="Use the information from your preparation and from the service representative to resolve the LPAR configuration error if it appears and to reassign or rename resources, as appropriate.">Perform resource management</a></div>
</div>
<div class="relconcepts"><strong>Related concepts</strong><br />
<div><a href="../rzait/rzaitmoveresources.htm">Perform dynamic movement of resources</a></div>
</div>
<div class="reltasks"><strong>Related tasks</strong><br />
<div><a href="rzamdexpanupgradelparresource.htm" title="Use the information from your preparation and from the service representative to resolve the LPAR configuration error if it appears and to reassign or rename resources, as appropriate.">Perform resource management</a></div>
<div><a href="rzamdexpanupgradelparcfgbus.htm" title="Perform the following steps if a logical partition configuration error was detected when powering on the system after the expansion unit conversion.">Resolve LPAR configuration error</a></div>
<div><a href="../rzamh/rzamhaccess.htm">Access DST</a></div>
</div>
</div>
</body>
</html>