ibm-information-center/dist/eclipse/plugins/i5OS.ic.rzaiu_5.4.0.1/rzaiurzaiu330.htm

91 lines
5.7 KiB
HTML
Raw Normal View History

2024-04-02 14:02:31 +00:00
<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE html
PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
<html lang="en-us" xml:lang="en-us">
<head>
<meta http-equiv="Content-Type" content="text/html; charset=utf-8" />
<meta name="security" content="public" />
<meta name="Robots" content="index,follow" />
<meta http-equiv="PICS-Label" content='(PICS-1.1 "http://www.icra.org/ratingsv02.html" l gen true r (cz 1 lz 1 nz 1 oz 1 vz 1) "http://www.rsac.org/ratingsv01.html" l gen true r (n 0 s 0 v 0 l 0) "http://www.classify.org/safesurf/" l gen true r (SS~~000 1))' />
<meta name="DC.Type" content="concept" />
<meta name="DC.Title" content="Restrictions for commitment control with save-while-active" />
<meta name="DC.Relation" scheme="URI" content="rzaiuswaconsid.htm" />
<meta name="DC.Relation" scheme="URI" content="../rzakj/rzakjcommitkickoff.htm" />
<meta name="copyright" content="(C) Copyright IBM Corporation 2004, 2006" />
<meta name="DC.Rights.Owner" content="(C) Copyright IBM Corporation 2004, 2006" />
<meta name="DC.Format" content="XHTML" />
<meta name="DC.Identifier" content="rzaiu330" />
<meta name="DC.Language" content="en-us" />
<!-- All rights reserved. Licensed Materials Property of IBM -->
<!-- US Government Users Restricted Rights -->
<!-- Use, duplication or disclosure restricted by -->
<!-- GSA ADP Schedule Contract with IBM Corp. -->
<link rel="stylesheet" type="text/css" href="./ibmdita.css" />
<link rel="stylesheet" type="text/css" href="./ic.css" />
<title>Restrictions for commitment control with save-while-active</title>
</head>
<body id="rzaiu330"><a name="rzaiu330"><!-- --></a>
<!-- Java sync-link --><script language="Javascript" src="../rzahg/synch.js" type="text/javascript"></script>
<h1 class="topictitle1">Restrictions for commitment control with save-while-active</h1>
<div><p>Restrictions for commitment control with save-while-active consist of object-level
resource restrictions and application programming interface (API) resource
restrictions.</p>
</div>
<div>
<div class="familylinks">
<div class="parentlink"><strong>Parent topic:</strong> <a href="rzaiuswaconsid.htm">Considerations and restrictions for the save-while-active function</a></div>
</div>
<div class="relinfo"><strong>Related information</strong><br />
<div><a href="../rzakj/rzakjcommitkickoff.htm">Commitment Control</a></div>
</div>
</div><div class="nested1" xml:lang="en-us" id="conceptSunDec051606592004"><a name="conceptSunDec051606592004"><!-- --></a><h2 class="topictitle2">Object-level resource restrictions</h2>
<div><div class="p">You cannot make object-level resource changes for objects under commitment
control that are in the object-level resource library while the server performs
checkpoint processing for those objects. You cannot make object-level resource
changes if either of the following are true: <ul><li>The commitment definition is at a commitment boundary.</li>
<li>Only record-level changes have been made in the uncommitted transaction.</li>
</ul>
</div>
<p>For this situation, the change does not occur until the save-while-active
request completes checkpoint processing for the library. After a delay of
approximately 60 seconds, you receive inquiry message CPA8351. The inquiry
message allows you to continue to wait for the checkpoint processing to complete
or to cancel the request for the object-level resource. If the job is a batch
job, the QSYSOPR message queue receives inquiry message CPA8351.</p>
</div>
</div>
<div class="nested1" xml:lang="en-us" id="conceptSunDec051607232004"><a name="conceptSunDec051607232004"><!-- --></a><h2 class="topictitle2">Application programming interface (API) resource restrictions</h2>
<div><p>You can register an API resource within a commitment control transaction
with the QTNADDCR API. If you set the <span class="uicontrol">Allow save while active</span> field
to <samp class="codeph">Y</samp> when you use this API, the considerations in this topic
do not apply.</p>
<div class="p">You cannot place resources under commitment control if the server is performing
checkpoint processing for any save-while-active request and either of the
following are true: <ul><li>With the Add Commitment Resource API (QTNADDCR program), the commitment
definition is at a commitment boundary.</li>
<li>Only record-level changes have been made in the uncommitted transaction.</li>
</ul>
</div>
<p>For this situation, the add is delayed until checkpoint processing is complete
for the save-while-active request. After a delay of approximately 60 seconds,
you receive inquiry message CPA8351. The inquiry message allows you to continue
to wait for the checkpoint processing to complete or to cancel the request
for the API resource. If the job is a batch job, the QSYSOPR message queue
receives the inquiry message CPA8351.</p>
<p>If a commitment definition has an API commitment resource associated with
it, and checkpoint processing is being performed for any save-while-active
request, then the job performing a commit or rollback operation for the commitment
definition is delayed immediately after the commit or rollback has been performed.
The server delays the job until the completion of checkpoint processing for
the save-while-active request. After the checkpoint processing is complete,
control is returned back to the job issuing the commit or rollback. This delay
is necessary because a commitment definition with an API commitment resource
is only considered to be at a commitment boundary <u>immediately after</u> a
commit or rollback operation but before control is returned to the user program.
Once the commit or rollback operation returns control back to the user program,
the commitment definition is no longer considered to be at a commitment boundary.</p>
</div>
</div>
</body>
</html>